Beer Brewery Equipment

7BBL-Brewery-Stainless-Steel-Fermentation-Tank
7BBL Brewery Stainless Steel Fermentation Tank
11/04/2019
Used Brewery Equipment
Used Brewery Equipment
08/04/2019

Beer Brewery Equipment

Beer Brewery Equipment

Beer Brewery Equipment

Company information

A Focus on quality 20 years

A Chinese craft beer culture disseminator

A brewery turn-key solution provider

A decisive market share leader in China

One of Asia high-end craft brewery equipment manufacturer , the most professional design and manufacturing team. He has been adhering to the spirit of craftsmen and craftsmen, insisted on developing and innovating independently on the basis of learning and introducing new technologies. Now have established own unique brewery equipment product system, and there will be 2-3 new products to market every year.

2000L commercial beer brewing equipment product description

Beer Brewery Equipment produced by us is a set of technological equipment for

the production of “live” and filtered beer, which includes miller-brewhosue(mash/lauter/kettle/whirlpool tun)

-fermenter-bright beer tank-filter-glycol chilling unit-CIP-control panel -keg filler and rinser etc.

Brew master make their beer attractive to consumers by unique brewing process and distinctive

beer taste. If desired, these beer brewingplant can be placed directly in places of consumption

of beer: restaurants,brewpub, bars, hotels, tourist and shopping centers. Interpreter may

be faced with polished brass, copper besides stainless steel.

2000L commercial beer brewing equipment  Configuration 

Beer Brewery Equipment

1. Miller of light beer brewery system
Particle adjustable rolling crusher
Flexible or steel auger for optional

This kind of grain mill was designed to help you get most of the grain. The nickel alloy rollers,

with optimized spiral fluting patterns on it, can be easily adjusted to provide suitable gap

for making different grain types, which can meet both decoration brewing and infusion brewing.

2. 2000L commercial beer brewing equipment
 

 

 

 

The Heating

Way

Steam The steam heating would require a boiler/generator.

It heat evenly and fast, also easy to control temperature,

not scorch the pot.

 

Direct fire

The burner and agitator are equipped with kettle.

If you adopt decoction mashing way,

the wort is easier to scorch.

If so, the steam heating is more suitable.

 

Electric

The electric heating behaves well for the volume

under 500L, saving the investment on the boiler/burner,

if there is no condition to use the boiler/burner

or it is more economical by using electricity.

 

 

The structure

2000L Two vessels Mash/lauter tun+Kettle/whirlpool tun
Mash/lauter whirlpool tun+Brew kettle tun
2000L Three vessels Mash tun+Lauter tun+Kettle/whirlpool tun
Mash/Kettle tun+Lauter tun+Whirlpool tun
2000L Four vessels Mash tun+Lauter tun+Kettle tun+Whirlpool tun
 

The Manway

Stainless steel Affordable
Glass Easy to observe the tank inside
 

 

 

False bottom/filter

 

 

 

False bottom/filter

We use the Laser cutting V-wire False Bottom/Filter.

This kind of False Bottom/Filter is more stronger, even

and nonpollution of welding.Using this false bottom

when lautering, you will find that the grain bed

is easy to form well and it will be also easy to clean

when you finish the lautering.

 

 

 

Rake

 

 

 

Rake

We now use the Long-style rake;

the teeth of the rake is varied

so that it can agitate the wort lengthways and transversely,

plus its length, the rake can help to make the malts mix

with the water soon and make the wort flow smoothly

and help to form a efficient grain bed for better lautering.

In addition, the automatic rake lifting units is optional

for customer.

Beer Brewery Equipment

3. 2000L Light Beer Fermenter of light beer brewery equipment
Function Wort Fermentation or maturation
Tank Capacity 20hl or 40hl (+25% Headspace minimum)
Interior Shell SUS304 full welded; TH=3mm
Exterior Shell SUS304 full welded; TH=2mm
Insulation Polyurethane; TH=80mm
Glycol Jacket Dimpled plate on cone and side
Head and Bottom Dished head and 60 degree cone bottom
Sampling valve Full sanitary perlick style sampling valve
Safe valve Mechanical relief valve 2 bar on CIP arm
Pressure gauge Shockproof pressure gauge with two gauges on CIP arm
Beer outlet Rotating racking arm and port on cone with butterfly valve
Hopping port Dry hopping port with solid end cap
Leg 4pcs completely SUS304 heavy duty legs with leveling pad and legs support

Beer Brewery Equipment

 4. Glycol chilling unit of light beer brewery equipment
Function Glycol water supply for wort cooling and fermentation cooling
Structure Glycol water tun+2 chillers(the cold liquor tun is optional)

We equip two chillers for all of the breweries. Even though there is one chiller does not work, another one can take place of it and continue to cool, so the beer in fermenter would not be affected.

Besides, some experienced brewers prefer cold liquor tank(cold water tank) for cooling

the wort in the heat exchanger. If so, two stages heat changer(tap water and glycol water) will be changed to

single stage(cold water). The wort can be cooled much quicker than before. Accordingly, the cold water

would also be heated to a high temperature. In this case, the cold water passing the heat changer would be recycled to hot water tank directly. This kind flow can save much

energy.

The most important advantage is the wort would not be polluted when the heat exchange is broken by accident.

5. Control panel of light beer brewery equipment
Function Brewhouse, fermenter, BBT, glycol chilling unit, CIP controlling
Assembling Style Floor Type/Wall hanging
Electrical Parts World wide brand CE certificated
Exterior Shell SUS304 full welded; TH=2mm
Category Instrument Panel; PLC Panel with Touch Screen

The comparison of instrument and PLC control panel

Instrument panel: the program is very stable. Although one module is broken, it would not affect other modules.

The PLC panel: Modern and beautiful. And it has high visual degree.

6. Portable CIP cart of light beer brewery equipment
Function Clean in place for tanks
Structure Caustic Tank+ Sterilization Tank
Shell SUS304 full welded; TH=2mm
Interior Finish Polish  0.4~0.6 μm

Our services

Your questions would be replied within 24 hours by our sales team.

b.) Project planning and design services;

There are professional engineers and technicians in our company, so we can customize the equipment

according to your requirements. What is more, both 2D and 3D drawings can be supplied for your reference.

c.) Free debugging instruction of equipment Training of equipment maintenance and operating;

We would send profession engineers to help you assemble all of the tank and train the operator freely.

d.) Warranty;

Provide 5 years complete warranty for tanks body and lifetime maintenance service;

All of the accessories and auxuliaries facilities are guaranteed for one year.