Brewery System Processing

5000L Beer equipment
Three vessels brewhouse system
14/05/2019
Beer brewery plant
Micro brew system
12/05/2019

Brewery System Processing

System Components Specification 
Milling System Miller Double Roller:700rpm, 600rpm
Drive Power:  0.55kw
Output: 50kg/hr
Brewhouse System Mash/Lauter tun Grain mashing, Lautering
Brew Kettle/Whirlpool Tank Wort boiling and whirlpool
Hot Water Tank  Hot water supply
Heat exchanger One stage and two stage
Fermentation System Fermentation Tank Top manway/Side manway
Drying hop port to brew IPA
Glycol Dimple jacket
Carbonation port to fill CO2
Yeast Adding Tank(option) SUS304 Stainless Steel
Cooling System Glycol tank Equipped with PU level indicator
Glycol Chiller Glycol water chilling (2HP)
Power supply: 3*220V/60Hz
Cleaning System Cleaning, sanitizing and sterilization of vessels and pipes in the brewery
Control System Control Cabinet Manual/Semi-automatic/Automatic
 All components & parameters can be customized according your requests.

Brewery System:

Output/Brew 200L 300L 500L 600L 800L 1000L
Brew / Week 2~6 2~6 2~6 2~6 2~6 2~6
Output / Week 400~1200L 600~1800L 1000~3000L 1200~3600L 1600~4800L 2000~6000L
Electric Supply 3phase/380(220, 415,440…)v/50 (60)Hz
Single Phase/ 220(110, 240…)v/50(60)Hz
Heating Source Electric/Steam
Area Request >25M2 >30M2 >45M2 >50M2 >60M2 >70M2
Brew master 1 1 1 1 1 1

1000L brew system

5000L brew system

Brewery System Processing:

Our stainless plate import from Korea or China famous brand, also the surface treating could reach 2B standard.

Polishing accuracy could reach 0.4um, while the welding is the fish scale welding with beautiful pattern.

After sale service

  • Free consultation service before, during, and after sales;Layout plan in 3D or CAD drawings of your brewery;
  • Professional engineers going abroad for the installation,debugging,and training,all the travelling cost and locate food and hotel shall be afforded by the buyer
  • The installation period is about 15 days including assembling brewing tanks and training the operater. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.
  • Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.
  • Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately.
  • If needed, cost calculate additionally.
  • Brewing technology,brewing formula,can be offered available
  • More spare parts are available to offered freely.